The diaphragm wall is constructed by applying the methods described in the technical specification (TSE EN 1538, Special Geotechnical Applications – Diaphragm Wall, BS 8004:1986 Code of Practice for Foundations) by creating a pit in the ground at the thickness and depth stipulated in the project, placing the prepared reinforcement cage in this pit and pouring the concrete. completed with the pouring process.