Reinforced Piles

Drilling starts with unreinforced piles first. After the unreinforced piles that reach the required depth are finished, reinforced piles are started and the application is made in accordance with the project standards.

667393822

Hydrographic Curve

This method, which is mostly applied in Dam Body, aims to provide impermeability. The application of this shoring system is the same as the Diaphragm Wall. It allows the dam to hold water by extending the hydrographic curve in the dam bodies.

240702146

Diaphgram Wall

The diaphragm wall is constructed by applying the methods described in the technical specification (TSE EN 1538, Special Geotechnical Applications - Diaphragm Wall, BS 8004:1986 Code of Practice for Foundations) by creating a pit in the ground at the ...