Drilling starts with unreinforced piles first. After the unreinforced piles that reach the required depth are finished, reinforced piles are started and the application is made in accordance with the project standards.
Hydrographic Curve
This method, which is mostly applied in Dam Body, aims to provide impermeability. The application of this shoring system is the same as the Diaphragm Wall. It allows the dam to hold water by extending the hydrographic curve in the dam bodies.
Diaphgram Wall
The diaphragm wall is constructed by applying the methods described in the technical specification (TSE EN 1538, Special Geotechnical Applications - Diaphragm Wall, BS 8004:1986 Code of Practice for Foundations) by creating a pit in the ground at the thic ...
Dewatering
Ground water removal is widely used for shallow depth excavations. Under favorable ground conditions, a well drilling system can be quickly installed and operationalized quickly. A typical well inspection system consists of small diameter wells (known as ...