Skip to content

Deep foundation systems

CFA Piles

Continuous auger drilling with controlled concreting.

CONTINUOUS FLIGHT AUGER04
CFA Piles — Schematic illustration of the method · Not to scale Continuous augerConcreting
Schematic illustration of the method · Not to scale

Method overview

Continuous auger drilling with controlled concreting.

CFA stands for Continuous Flight Auger piling. A pile is formed by pumping concrete through the hollow auger stem; reinforcement is then placed into the fresh concrete. Drilling and concreting form a controlled sequence of construction.

Low vibration

An installation option with lower vibration than driven piling methods.

Continuous construction

Drilling and concreting form a complementary sequence in suitable ground conditions.

Process control

Concrete pressure, volume and auger withdrawal rate are assessed together.

CONTINUOUS FLIGHT AUGER

Installation stages

  1. Preparation and setting out

    Pile positions, the working platform and concrete supply are planned.

  2. Continuous auger drilling

    The hollow-stem auger advances to the design depth.

  3. Concreting and withdrawal

    Concrete is pumped from the base as the auger is withdrawn under control; pressure and volume are monitored.

  4. Reinforcement and completion

    The cage is placed into fresh concrete; construction records and the pile head are completed.

Applications

  • Residential, commercial and industrial building foundations
  • Suitable urban sites where vibration effects are important
  • Piled retaining systems where specified in the design

Quality and site control

Drilling depth, verticality, concrete pressure and volume, and withdrawal rate are critical parameters. Concrete workability must allow reinforcement placement. The soil profile, obstructions and equipment capacity inform method selection.

Frequently asked questions

When is the reinforcement installed?

In standard CFA construction, the cage is placed into fresh concrete after concreting and auger withdrawal have been completed.

Is it suitable for every soil?

No. Very hard layers, large obstructions, reinforcement requirements and equipment limits affect suitability. Selection follows the ground investigation.

Every sound project starts with the right foundation.

Contact Geofond to assess the ground investigation, structural loads and site requirements together.

Discuss your project